I’ve already written about the 12cR3 to 12cR4 upgrade here. I did a few run through’s at home to practice it and it all seemed good.

Setting The Scene

Just to set the scene, for our production environment we run Cloud Control in a VMware virtual machine, using Oracle Linux 6.5 as the guest OS. With that setup, we can use a simple installation (DB and OMS on the same VM) and use VMware to provide our failover, rather than having to worry about multiple OMS installations and any DB failover technology etc. If there’s one thing I’ve learned about Cloud Control, it’s Keep It Simple Stupid (KISS)! As far as our managed servers go, most of our databases and all our middle tier stuff runs on VMware and Oracle Linux too. We have a handful of things still hanging around on HP-UX and Solaris, which will hopefully be migrated soon…

Upgrade Attempt 1 : Non-Starter

Yesterday I started the upgrade of our production system. Pretty much straight out of the blocks I hit a road block. It didn’t like the agents running on our HP-UX servers. The upgrades of the HP-UX agents are so painful. Every time so far I’ve had to reinstall them. As a result, I didn’t bother to upgrade them last time and kept running with the previous version of the agents. The upgrade wouldn’t have anything to do with that, so I forgot about the Cloud Control upgrade and I spent yesterday attempting to upgrade the HP-UX agents to 12cR3, before I could attempt the 12cR4 Cloud Control upgrade.

As usual, the upgrade of the agents on HP-UX involved me uninstalling, removing all the targets, installing, discovering all the targets and setting up the backups etc. Not all of it is scripted yet, so it is an annoying and painful process. I’m not sure if other HP-UX users suffer this, but it seems pretty consistently bad for us. The sooner we get rid of these straggling HP-UX servers the better!

So this wasn’t so much a failure of the upgrade. It was really down to me being lazy and not bothering to upgrade some agents.

Fast forward to this morning and I was actually ready to start the upgrade. 🙂

Upgrade Attempt 2 : Success

With the 12cR3 agents in place on HP-UX, the upgrade ran past that step with no problems and on to the main body of the installation. The install and upgrade were textbook.

I’ve upgraded the agent on the cloud control server, but I’m not going to upgrade any of the other agents until I know things are working fine.

Happy days!

Cheers

Tim…